Movable Power Plant at Batamindo Power house consist of Civil works (such as Foundation engine enclosure, foundation MV enclosure, foundation Power transformers, foundation auxiliary transformer), Electrical works (such as Low voltage cable, Medium voltage cable, cubicle panel, grounding system including PE design, testing and commissioning), Mechanical works (such as Air intake system, Fresh oil pipe system, waste oil pipe system, Drain water PSV HT & LT system, pipe HT cooling system, pipe LT cooling system, Gas pipe line system, pipe hydrant system including testing and commissioning)
INFINEON BATAM 3 PH 1 PROJECT
- Batam – Indonesia
- EPCM
- Construction And installation