The platforms will be installed on the coast of Australia, they come with 11 sets of platforms which will be joined and stacked as well, each platform also come with wooden floor, wall and other accessories as required, it becomes a challenge for the manufacturing team to strictly control on some critical dimensions, this challenge is managed by the team and it is a success as those platforms can be assembled and joined completely without any major problems.

INFINEON BATAM 3 PH 1 PROJECT
- Batam – Indonesia
- EPCM
- Construction And installation